Does your plant use volatile organic solvents? Learn more about the conditions under which you must have emissions checked through individual measurements here.
Soil protection is used to secure or restore the functions of the soil. The soil is an indispensable basis of life for nature and society, their development and sustainable usability. Soil cannot be increased and has only a limited load-bearing ...
Whether it's noise, light, odors, air pollution, or vibrations – official emission control serves to protect the public's environment from harmful environmental impacts. Here you can find out what is regulated and who to contact if you have any problems.
Permits according to §§12 and 22 of the Plant Protection Act (PflSchG). Operating permits for the following cases Import of Annex VB goods according to Plant Quarantine Directive 2000/29 / EC Destination control (BOK) according to § 8a Plant ...
If you operate a large combustion plant, gas turbine or combustion engine plant, you must have the pollutant emissions checked regularly through individual measurements. You must prepare a measurement report on the results of the individual measurements.
If you operate a large combustion plant, gas turbine or internal combustion engine plant, you must continuously determine, record and evaluate pollutant emissions through continuous measurements.
If you already operate a medium-sized combustion plant, gas turbine, or combustion engine, you must report this to the relevant air pollution control authority.
Do you operate a waste incineration plant or a combustion plant that burns waste? Learn how to determine pollutant emissions through periodic measurements here.
If you're a specialist company that wants to maintain small wastewater treatment plants, you need a permit. Here you can find information about the process, costs, duration, and required documents.
Do you operate a waste incineration plant or a combustion plant that co-incinerates waste? Learn how to determine pollutant emissions through continuous emission measurements here.
Do you operate a medium-sized combustion plant, gas turbine, or combustion engine plant? Learn how to submit a measurement report on individual air pollutant measurements here.
If you want to operate a facility that does not require a permit and emits volatile halogenated organic compounds, you can find out how to report this to the responsible authority here.
Do you operate a biological waste treatment facility? Learn how to submit a report on individual air pollutant measurements to the responsible authority here.
Do you operate a large combustion plant, gas turbine, or internal combustion engine plant that co-incinerates waste? Learn how to submit the annual information about your plant here.
You must notify the responsible authority under certain conditions of any change in the location, condition or operation of a wastewater treatment plant.
If you're planning to commission a medium-sized combustion plant, gas turbine, or internal combustion engine, you can find out how to notify the relevant authority here.
As the operator of a medium-sized combustion plant, gas turbine or combustion engine plant, you must, under certain conditions, determine pollutant emissions through continuous measurements and prepare a measurement report on the results.
Are you planning an emissions-relevant change to a medium-sized combustion plant, gas turbine, or internal combustion engine? You must notify the responsible emissions control authority.
If you want to permanently shut down a medium-sized combustion plant, gas turbine, or internal combustion engine, you can find out how to notify the responsible authority here.
If you want to sell animals, plants or products of a strictly protected species or use them commercially, you must first apply for a marketing permit from the responsible authority.
If you want to discharge commercial wastewater into a private wastewater plant or sewer system, you need a permit. Under certain conditions, the competent authority may allow you to start discharging before you have received approval.
If you intend to make changes to a plant that generates electricity from renewable energy sources and requires a permit, you must apply for a permit from the responsible authority.
If you want to infiltrate pre-treated wastewater from a small sewage treatment plant or discharge it into a surface water body, you must apply for a water law permit from the responsible water authority.
Would you like to discharge commercial wastewater into a private wastewater plant and be exempt from the permit requirement? You must then submit an application for exemption from the approval requirement to the responsible authority.
If you have newly appointed or dismissed an emissions control officer or if there have been changes in his or her area of responsibility, you must report this to the responsible emissions control authority.
If you want to change a discharge from a small sewage treatment plant for which you have a water law permit, you must apply to the responsible authority for a permit change.
Are you applying for approval of installations using the simplified procedure? You can then obtain a permit from the competent authority to construct and operate facilities of a certain type or size without public participation.
Does your plant use volatile organic solvents? Learn more about the conditions under which you must have emissions checked through individual measurements here.
If you are a specialist company that wants to clean and maintain separator systems, you need a permit. Here you can find information about the process, costs, duration, and required documents.
A wastewater charge is levied for discharging wastewater into surface water or groundwater. The wastewater charge you pay can be offset against certain investments you have made if certain conditions are met.
If you want to operate a crematorium, you must notify the responsible immission control authority that the cremation system has been put into operation.
If you want to set up or operate a part of the plant that can damage the environment to a particular extent or endanger the general public, you need a partial permit.
If you, as the operator of a landfill, are obliged to submit an emissions declaration, you can be exempted from the obligation to submit an emissions declaration under certain conditions.
If you wish to set up and/or operate a facility to carry out genetic engineering work at safety levels 3 and 4, you will need a permit from the competent authority.
If you, as a qualified person, want to perform recurring inspections of separator systems, you will need a permit. Here you can find information about the process, costs, duration, and required documentation.
You can get advice on the disposal of hazardous waste. You will receive information about suitable waste disposal facilities, possible disposal routes and necessary documentation.
If you handle organic solvents in your company, you may have to report the system to the responsible authorities if you exceed an activity-related threshold.